Uzbekistan

The President got acquainted with the activities of a gas block manufacturing enterprise in Nukus

The "Coals KS" enterprise has the capacity to produce 300 thousand cubic meters of gas blocks and 165 thousand tons of lime per year.

The President got acquainted with the activities of a gas block manufacturing enterprise in Nukus

President Shavkat Mirziyoyev reviewed the activities of the «Coals KS» enterprise in Nukus.

 

The total cost of the project is 16.3 million dollars. The enterprise has established the production of gas blocks and lime. For the production of gas blocks, a 4.8-hectare area has been allocated in the «Nukus» free economic zone. The lime production facilities are located on a 4.8-hectare area in the Qorao‘zak district.

 

The enterprise has the capacity to produce 300 thousand cubic meters of gas blocks and 165 thousand tons of lime per year. This allows not only supplying the domestic market with modern construction materials but also establishing exports. It is planned to export the products to Kazakhstan and Turkmenistan.

 

96 percent of the raw materials used in production are sourced from local sources. In particular, quartz sand, cement, and gypsum are supplied by enterprises in our country. This is important for reducing the cost of products and ensuring the stability of supply.

 

The gas blocks produced at the enterprise stand out for their lightness, heat retention, and sound insulation properties. They are 3-4 times lighter than ordinary solid brick, which serves to reduce construction costs.

 

Today, 200 local residents work at the enterprise. To date, 5 large projects with a total value of 200 million dollars have been launched by the enterprise. Construction work is ongoing on 4 new projects worth another 40 million dollars.

 

The head of state reviewed the production processes and products, and listened to information about the enterprise's future plans. He had a sincere conversation with the workers.

 

The importance of maintaining high quality while reducing product costs, expanding production volume and export opportunities, and regularly improving the qualifications of employees was emphasized. Relevant recommendations and instructions were given to the enterprise management and those responsible in the sector.

 

custom img

The President visited the reconstructed stadium in Nukus.

As a result of the reconstruction, the capacity of the "Turon" stadium was increased from 9,300 to 12,000 seats.

custom img

President Shavkat Mirziyoyev visited a street in Nukus that operates around the clock

2.2 billion soums have been allocated for the improvement of streets.

custom img

The President got acquainted with the activities of Technical School No. 1 in Nukus.

The "Pearson BTEC" international education program of Great Britain has been introduced at this technical college.

custom img

Shavkat Mirziyoyev got acquainted with the activities of the Nukus Insulation Group enterprise

Modern building materials are being produced from local basalt in Nukus.

custom img

In Karakalpakstan, projects worth 7.6 billion dollars were launched and the construction of new capacities was started.

President Shavkat Mirziyoyev participated in the ceremony of launching new projects and giving a start to their construction.

custom img

Food poisoning: 31 people hospitalized in Fergana

Suspected food products and relevant samples from patients have been collected and sent for laboratory testing.

custom img

President Shavkat Mirziyoyev got acquainted with the medical academy in Nukus

Modern opportunities have been created to improve the qualifications of medical personnel in the Aral Sea region.

custom img

7 cemeteries will be relocated due to the construction of the new Tashkent airport

2 of them are located in Quyi Chirchiq, 5 in O'rta Chirchiq district.

Certificate: â„–1346 Issue date: 28.05.2020

Idea author: Firdavs Fridunovich Abdukhalikov

Founder: "Master Media Production and Broadcast"